St Andrews Park, Uxbridge (light case study)

Case Study

St Andrews Park, Uxbridge (light case study)

Location

St Andrews Park
Uxbridge UB10 0RY; 51°32’34.3″N 0°27’55.0″W

Description

The 44 hectare site is located to the west of Central London and has been redeveloped into a mixed use residential development (1500) with retail, business premises and leisure amenities in the form of an urban park (Dowding Park 40 acre, opened 2018). VSM Estates Limited (VSM) was the strategic developer of the site and provided the strategic drainage and highway infrastructure across the site. Please download the full pdf for the case study .

SuDS used

  • Permeable Paving
  • Swale
  • Detention Basins

Download Case Study